Monday, March 23, 2009

Minor Update

Jake and I had a productive Saturday (3/21/09). We had the tires mounted and balanced on the newly painted rims down at Larkin Tire in Pleasant Grove. They are so sweet looking. Then Jake and I spend time refreshing/repainting all of the engine tin, which took most of the day, and then we installed the motor. I've been going back an forth on whether or not to have the engine in or out before putting the body back on, but we opted to install the engine first. That way we can adjust things easier before committing the body to the chassis.

Next up we're going to run the electrical through the body and install the firewall components in the engine compartment.

0 Comments:

Post a Comment

<< Home